How to interpret the result
- Measure the clear opening with the door open, not only the nominal slab width.
- Sometimes offset hinges or removing a door solves the route with less construction.
Transparent method
The tool applies this planning structure:
door count × wall-condition allowance × finish factor + contingencyImportant limits
- Header design, utilities, fire ratings, lead/asbestos, and floor repair require inspection.
- Clearance needs vary by mobility device and maneuvering pattern.