How to interpret the result
- Prioritize clear movement space, bathing access, wall reinforcement, lighting, and slip resistance before decorative upgrades.
- Require waterproofing and blocking locations to be documented before walls close.
Transparent method
The tool applies this planning structure:
scope baseline + area adjustment + plumbing/structural allowances + contingencyImportant limits
- Mold, rot, slab work, asbestos, lead paint, structural framing, and electrical-panel upgrades are excluded.
- An occupational therapist or qualified accessibility professional can help match the layout to the person.