Start with the daily route
Map the path from arrival to sleeping, bathing, toileting, cooking, and emergency exit. Record where a person needs help, avoids a space, or faces a threshold, tight turn, poor light, or unstable surface.
Rank consequence before convenience
Address hazards with serious consequences and routes used every day before cosmetic work. Some problems need a simple product; others require construction, professional assessment, or both.
- Urgent: unstable access, bathing or transfer hazards, missing rails, failing surfaces
- Near term: door clearances, lighting, controls, flooring transitions
- Future: first-floor living, major bath work, lift or addition
Write a phased scope
For each phase, define the user goal, measurable outcome, included work, exclusions, and trigger for the next phase. Keep photos and dimensions so later decisions start with evidence.
Rules, programs, and conditions change. Confirm requirements with the official source, local building department, and qualified professionals.